Concrete Pump
Outrigger Pads

UHMW-PE outrigger pads for boom pumps and line pumps. Protect driveways, pavements and finished surfaces. Concrete doesn't bond — wipes clean after every pour. UK stock, next-day delivery.

UK Stock — Next Day Delivery
800mm to 1200mm+ Available
Rated Up to 115 Tonnes
Expert Technical Support

The Problem

Why Concrete Pumps Need Outrigger Pads

Boom pumps generate outrigger loads exceeding 20 tonnes per leg on larger units. They set up on residential driveways, car parks, and pavements where the ground can't handle a concentrated point load.

Without pads, operators risk sinking into soft ground, cracking driveways, puncturing tarmac, and liability claims for surface damage. A set of UHMW-PE pads pays for itself within a few jobs.

Material Performance

Why UHMW-PE for Concrete Pump Work

  • Protects driveways, pavements and finished surfaces
  • Spreads outrigger load across a wider ground area
  • Light enough for one operator to carry and place
  • Concrete does not bond — wipes clean after every pour
  • No water absorption, performs the same in rain
  • Reusable across thousands of pours with no degradation

Quick Sizing Reference

Which Pad for Your Pump?

Use the Pad Size Calculator for precise recommendations based on your pump spec and ground conditions.

Pump Type Typical Leg Load Recommended Pad From Shop
Small line pump Up to 8 tonnes per leg 800mm round, 50mm thick £220 Shop →
24–32m boom pump 10–18 tonnes per leg 1000mm square, 60mm thick £399 Shop →
36–42m boom pump 18–30 tonnes per leg 1000–1200mm square, 60mm thick £399 Shop →
47m+ boom pump 30+ tonnes per leg 1200mm square or modular system £469 Shop →

Not Sure Which Size You Need?

Enter your pump's outrigger load and ground conditions. Get an instant pad recommendation in under 60 seconds.

Easy Clean-Up

Concrete Doesn't Bond to UHMW-PE

One major advantage over timber and steel: concrete splashes peel or chip off the polymer surface after the pour. A quick pressure wash or scrape and the pads are ready for the next job.

Timber mats absorb concrete slurry and get heavier and weaker over time. UHMW stays the same weight and strength pour after pour.

Fleet Supply

Trade Accounts and Volume Orders

Running a fleet of boom pumps or line pumps? We supply pad sets for pump hire companies and concrete contractors across the UK.

  • Consistent pad specs across your entire fleet
  • Volume pricing available on orders of 4+ pads
  • Next-day delivery on all UK stock items
  • One-to-one technical support on fleet selection

Ready to Order?

UK stock. Next-day delivery. Technical advice on every order.